
CASE STUDIES
Thank you to J. Calnan & Associates Construction for inviting us to be your #labfitoutpartner on the recent T-Scan Therapeutics lab fitout designed by Perkins + Will Architects. STEM provided and installed painted steel casework, stainless steel sinks, chemical fume hoods, pre-wired and pre-piped lab benches, and utility service panels.
Architect: Perkins + Will
Contractor: J. Calnan & Associates
STEM Solutions recently completed this high-performance #labfitout at 451 D Street in South Boston.
STEM provided and installed:
High Performance Fume Hoods, Powder Coated Steel Casework, Flexible Lab Benches, Ceiling Utility Panels, Electrical Raceways, Chemical Storage, Epoxy Counters, Laboratory Fixtures
Architect: Lab / Life. Science. Architecture, Inc.
Contractor: Wise Construction
Check out this video of a project we recently completed with Diversity Construction for
Three Rivers Community College. STEM Solutions installed and provided wood casework with
epoxy resin tops and a custom stain to match existing casework.

